Documents
Find below a list of all the documents available for viewing or download.Documents in other categories may be found by selecting the desired category from the Document Category menu below.
Search:
File
Date
File
03 Dec 2020 Skye Lochalsh and South West Ross Transport andAccess Plan
03 Dec 2020
.pdf(1.17 MB)
13 Feb 2020 Inverness Rail East Feasibility Study
13 Feb 2020
.pdf(2.28 MB)
05 Feb 2020 HIGHLAND MAINLINE UNFAZED
05 Feb 2020
.pdf(1.56 MB)
20 Nov 2019 Wick – Thurso Battery Train Feasibility Study
20 Nov 2019
.pdf(793.27 KB)
12 Jun 2019 Williams Rail Review HITRANS Response
12 Jun 2019
.pdf(43.82 KB)
03 May 2019 HITRANS Rolling Stock Feasibility Study
03 May 2019
.pdf(1.95 MB)
07 Dec 2018 Fish n Trips Report
07 Dec 2018
.pdf(1.81 MB)
14 Dec 2017 Train2Ride Study
14 Dec 2017
.pdf(1.97 MB)
08 Dec 2017 Midnight Train to Georgemas Study
08 Dec 2017
.pdf(1.75 MB)
28 Feb 2017 HITRANS Response to Transport Scotland Rail Infrastructure Strategy Consultation
28 Feb 2017
.doc(123.00 KB)
16 Jun 2016 Branchliner Presentation – Railing with the Flows
16 Jun 2016
.pdf(857.11 KB)
16 Jun 2016 Branchliner Presentation – Supplying the Railhead
16 Jun 2016
.pdf(3.11 MB)
16 Jun 2016 Branchliner Presentation – The Economic Case
16 Jun 2016
.pdf(160.43 KB)
16 Jun 2016 Branchliner Presentation – Timber by rail – is it really an option in Scotland
16 Jun 2016
.pdf(7.42 MB)
16 Jun 2016 Branchliner Presentation – Background to the Problem
16 Jun 2016
.pdf(3.82 MB)
16 Jun 2016 Branchliner Final Report
16 Jun 2016
.pdf(9.46 MB)
11 Dec 2015 Inverness Station Passenger Experience Survey Report
11 Dec 2015
.pdf(1,019.63 KB)
20 Jul 2015 InverSparkie – InverCity Rail Study Update
20 Jul 2015
.pdf(489.25 KB)
23 Dec 2014 Lifting The Spirit
23 Dec 2014
.pdf(832.66 KB)